Oilfield equipment manufacturer · Dezhou, China
ZHUORUIOILFIELD EQUIPMENT
ASSEMBLE · SERVICE · VERIFY

Hydraulic breakout units

Zhuorui hydraulic breakout units make up and break out threaded downhole tools. Compare DZZR main torque and spinner ratings, then choose the gripping and support arrangement for mud motor servicing or other workshop repairs.

160,000 ft-lbMake-up · range maximum
199,000 ft-lbBreak-out · range maximum
4Reference models
Torque and spinning functionsWorkpiece-specific clampingSupport and axial handling
Prepare your equipment enquiryView equipment specifications ↓
THE EQUIPMENT

Make-up and break-out in a service workshop

A hydraulic breakout unit, often called a breakout machine, is a make-up/break-out machine for threaded oilfield tools. Its clamps hold the two parts of an assembly while the main mechanism applies torque. The spinner handles the longer threaded travel after a joint is loosened, or during run-in before final make-up. Each function has its own rating.

Zhuorui breakout units are used for downhole-tool repair, mud motor servicing and repeated make-and-break work. Some jobs also need axial support or a push/pull arrangement for rotor and stator handling. Send the tool drawings and service sequence so we can check the torque, clamping and handling together.

We manufacture these workshop machines at the Zhuorui plant in Pingyuan, Dezhou. Dezhou Zhuorui Petroleum Machinery Co., Ltd. was established in 2011. The order defines the breakout unit, tooling and handling package, together with the delivery documents and support scope.

Bucking unit or breakout unit?

Both machines can make up and break out connections. Compare the drive, measured data and handling arrangement, rather than treating the names as opposite operations.

How the two connection machines differ
CompareContinuous-rotation bucking unitHydraulic breakout unit
Drive arrangementA powered head turns continuously through 360° under torque.High-torque wrenching and lower-torque thread spinning are separate functions.
Speed ratingReference operating speed: 0.5-6 rpm for controlled make-up.Spinner speed: up to 100 rpm. This is not the speed at maximum break-out torque.
Measured recordTorque against turns; shoulder and post-shoulder analysis with the specified package.Target and executed torque, a torque-time curve and a connection summary.
Typical workshop workCasing, tubing, coupling and connections requiring torque-turn acceptance.Mud motor and downhole-tool disassembly, repair and reassembly.
EQUIPMENT SPECIFICATIONS

DZZR breakout unit specifications and torque ratings

The DZZR-V3510, V3515A, V3515C and V3518 models have separate make-up, break-out and spinner ratings. The V3518 table entry lists 199,000 ft-lb break-out torque and 4,000 ft-lb spinner torque. Compare the head and backup sizes with the places your tools can actually be gripped.

DZZR model comparison

Select a model to add it to your enquiry.

Swipe the table to compare all columns →

ModelHead / backup · inCylindersMake-up · ft-lbBreak-out · ft-lbSpinner · ft-lb
DZZR-V351010 / 104130,000130,0002,950
DZZR-V3515A15 / 156155,000175,0003,300
DZZR-V3515C18 / 156160,000175,0004,000
DZZR-V351818 / 186160,000199,0004,000

The listed head and backup sizes are nominal limits. They do not give the full gripping range. We also need to check the minimum diameter and available gripping length for the selected jaws. Each torque value applies only to the duty named in its column.

Hydraulics and optional push/pull handling

ItemPublished arrangement
Maximum spinning speed100 rpm
Working / maximum pressure20 / 30 MPa
Hydraulic tank capacity600 L
Base length6,000 mm; configurable
Head-to-backup span4,000 mm; configurable
Axial push/pull stroke1,500 mm; configurable
Maximum push / pull force320 / 260 kN
Operator display15 in touchscreen

These figures describe a published hydraulic and handling package. They are not standard on every DZZR model. Confirm the push/pull requirement and installation layout in the quotation. Maximum spinner speed and maximum spinner torque are separate ratings.

Specifications reviewed 12 September 2026.

DESIGN & FUNCTION

What to check on the machine

High-torque break-out and thread spinning

Releasing a tight joint and spinning a loose thread are different jobs. Check the main break-out capacity for the first stage and the spinner’s torque and speed for the threaded travel that follows.

Head and backup gripping

The jaw arrangement depends on the diameter, contact length and surface of each gripping point. Tool shoulders and changes in diameter can limit where the clamps sit. A drawing of the complete assembly helps us check both ends.

Tool support and push/pull options

Support jacks and extension beams carry the tool along the bed. Where rotor or stator service requires axial movement, the push/pull option must have the stroke and force required for that component.

Torque display and job records

The torque display supports checks of target, live and peak values. The service report records target and executed torque for each connection, with a torque-time curve. Its time axis is not a turn-count measurement.

TECHNICAL GUIDE

Tool dimensions and machine requirements

Use the following points to check the proposed configuration. The quotation should identify the ratings, instruments and handling options supplied with your breakout unit.

Technical parameters and their role in selection
ParameterWhat to consider
Working principleHydraulic gripping and torque application, with spinning for threaded travel.
Connection dutySpecify required make-up torque and expected break-out demand as separate values.
Spinner selectionAgree spinner speed and torque separately from the main torque mechanism.
Gripping geometryCheck both heads against each component’s OD and usable gripping length.
Axial handlingPush/pull stroke, push force and pull force are distinct configuration parameters.
Measurement unitsTorque in N·m or ft-lb; axial force in kN; stroke in mm.
WORKSHOP PROCESS

Planning tool assembly or teardown

  1. 01

    Identify the service work

    List the connections to be opened or assembled, the condition of the tool and its dimensions. Use the approved service procedure to define the work.

  2. 02

    Check gripping and support

    Match the jaws and supports to the available clamping areas, tool length and access needed at each connection.

  3. 03

    Follow the torque and spinning sequence

    The operator follows the approved sequence for the tool while watching the connection and the fitted torque display.

  4. 04

    Save the service record

    Review the measured result and record which tool and connection it belongs to. Keep the report with the inspection and repair documents.

This is a description of the service work to plan for. Machine settings and acceptance limits come from the approved equipment instructions and tool procedure.

APPLICATIONS

Mud motor servicing and downhole-tool repair

Mud motor service workshops

Assemble and dismantle mud motor connections. Select the supports and any axial handling option needed for the rotor and stator work.

Downhole tool repair

Service tool assemblies, crossovers and other threaded components within the confirmed gripping and torque range.

Tubular and component servicing

Handle threaded tubulars that need controlled gripping, separate torque stages and a record of the workshop operation.

CONTROLS & SERVICE RECORDS

Breakout torque display and job reports

The breakout unit has its own torque-control and recording system. The operator checks live torque, peak torque, the target value and elapsed time. Job fields identify the operator, tool, model and connection being worked on.

The report below shows a mud motor make-up record from the breakout equipment reference. Its summary lists target and executed torque for each connection; the individual joint page plots torque against time. These are service records, with different measurements from the bucking unit’s torque-turn and shoulder analysis.

Breakout equipment report showing target and executed torque by connection and a torque-time curve
Breakout-unit make-up report exampleHistorical example from our breakout equipment records: connection-by-connection target and executed torque on the left, with one joint's torque-time curve on the right. Values belong to the example job.
Open report image ↗

Match the controls to the service procedure

Specify the torque display, required stop function and report format in the equipment order. Confirm how the operator starts, stops and resets each cycle during the machine handover. A screenshot of a report does not establish the control sequence for every model.

Keep disassembly and reassembly records separate. A make-up target is not the torque needed to release a used connection. For work that requires turn counts, shoulder detection or premium-connection torque-turn acceptance, review the bucking unit’s measurement package.

Read the workshop records guide →
QUESTIONS & ANSWERS

Breakout unit questions

Can a breakout unit also make up connections?

Yes. These units support assembly as well as disassembly. Check the make-up, break-out and spinner ratings individually for the selected model.

When is a bucking unit a better fit?

Compare the bucking unit with torque-turn monitoring when continuous rotation and connection assessment are central to the work. For teardown, short gripping areas or axial tool handling, compare the breakout unit’s actual layout and options. The names overlap across suppliers, so check what each quoted machine includes.

Is the breakout report the same as a torque-turn report?

No. The breakout report shown here lists target and executed torque and plots torque against time. It does not provide turn counts or shoulder detection. Choose the corresponding bucking-unit measurement package when the connection procedure requires torque-turn acceptance.

What do you need to quote a breakout unit?

Send the tool drawings, dimensions at both gripping points, required torque duties, and component length and weight. Include any push/pull work, available utilities and required reports.

Why is spinner torque lower than break-out torque?

The main mechanism supplies the torque needed to release a tight connection. Once it is loose, the spinner handles repeated turns at a different torque and speed. For example, the DZZR-V3518 reference lists 199,000 ft-lb for break-out and 4,000 ft-lb for spinning. These are different duties, not interchangeable capacities.

Can a breakout unit help with mud motor rotor and stator servicing?

It can handle threaded connection assembly and teardown within its confirmed capacity. If the repair sequence also needs axial movement, specify the push/pull option, stroke and required forces. Rotor/stator handling is a separate part of the scope and should be checked against the component drawings.

What affects the price of a hydraulic breakout unit?

Model size, torque requirements, jaw sets, bed and support length, push/pull equipment and recording controls all affect the quotation. List the tools and required service operations in the breakout unit enquiry form. We can then identify the base machine and the options needed for those jobs.

EQUIPMENT ENQUIRY

Tell us what you need

Share your connection, tool dimensions or the job you need to do. You can leave detailed specifications for the follow-up.

Send your requirements directly to Zhuorui. Read our privacy notice.

Last updated: · Markdown version: /products/breakout-units.md

Get a quote